More Tile -- and More Solar


Today started out with the usual, trying to find the right supplies for another strange issue.  One would THINK, that you could walk into a roofing supply company (that means that ALL they sell is roofing supplies) and ask for a flashing to go over a 3/4 inch copper pipe.  One's conversation may go something like this...

One - "Good Morning"
Guy sitting at desk of roofing supply company -- ...............silence
One - "Would you have a roof flashing for a 3/4 inch pipe
Guy -- Yes ...  for a 2 inch pipe, right
One -- No, 3/4 inch copper, it's for a water pipe through the roof
Guy -- "those are normally a 2 inch vent pipe
One -- No, I'm putting up a solar collector. (explanation... yada yada)
Guy -- I can probably order something like that
One -- ah, how long would it take to get here
Guy -- probably a couple of weeks...

What!! You've got to be kidding me.  This pretty much describes the normal expectations of people when it comes to the building trades.  I can get on eBay and within two days have just about anything I want.  BUT, if you don't know exactly what you want in advance, it would be nice to be able to actually buy something like this.  The kicker is that he can order it, wait 2 weeks, another trip into town to pick it up, and then it costs twice as much as the internet. 

I guess I'll be paying shipping, then...  eh??

Roof progress, it's beautiful!  And it's the only finished surface on the whole place except for the garage floor.





The other day I showed you the frame supports for the solar collector.  I painted them, and then had to go up on the roof and lay them out and attach them.  This was accomplished by determining the location, then drilling a hole through the roof so my wife could figure out where I was from below, then, while she held a 2x6 in position, I put 4 giant lag screws through everything to sandwich the roof deck between the board and the flange.  Also put roofing sealant everywhere to keep things watertight. 





Today, the roofers came back, and in additon to a million other things, they installed the roof tile around all the brackets and flashed everything with giant sheets of lead.  I wasn't there, but it looks like they pound the lead over another tile to copy it's shape, and then place it similar to a tile over any holes they have cut.  Pretty cool system, actually.  The lead is not cheap...


Another thing the tile guys did was show me how to walk on the tile roof.  The other day I broke a tile getting up there, which is obviously a bummer.   Anyway, you walk on the peaks of the tile, with your foot spanning the valley, so your weight is distributed over two tiles.   AND, you have to walk on the bottom edge of the tile, because that is the spot on the tile that connects directly to the next tile below it, and thus distributes your weight to the roof deck rather than making a tile bridge, which breaks the tile. 

So, I had so much confidence with my training that I hand carried the collector frame right up into position. 




What you MAY notice is that the copper connectors do not GO anywhere...  That is because I had some holes drilled into the roof deck where the copper pipe comes out from the attic, but the roofers saw those holes and promptly fixed them....  So, one more thing to ask them to redo.  It's easy to make the hole, but it bumms me out to have the guys rework stuff. 

BUT, if the roofing supply company would have had the dang pipe flashing... We wouldn't have this problem....


The other thing that had to be figured out was how to get the sensor wires from the thermistor down through the tile and roof deck.  After some thought, I decided I would just drill a hole in the frame pipe, and another through the deck directly under the pipe flange (through the mount), and push the wire straight down...  Which I did... Should have taken a picture... It was cool.

OH, to enable me to HAVE this thermistor, I had to buy the entire Solar Pumping Station... Why??  because, of course, nobody keeps a thermistor like this in stock.  They can order it, though, which goes from the plumbing supply store, to the distributor, back to the factory, and then has to repeat the return trip...  Since I eventually needed the pump station I just bit my lip...

Here is a picture of the Taco Solar Pumping Station...



Na, that's the cat infestation....  There is an idea...  Use cats as a packing material...  How about this...




I also learned to solder (or sweat) copper pipe.  There are many things that need to be sweat fitted together. 



Here is an example of my soldering, this is the left end of the solar collector.  This is where the collector sensor also goes.  The 3/4 inch threaded hole is for the "air elimination valve" will go.  The male pipe end will act to hold the water heater pipe connection (my choice for connection) which will connect to the roof penetrations...

The leg bones connected to the thigh bone...
The thigh bones connected to the hip bone...

etc...

Goodnight...

Ok, that's it for now...  We will soon talk plumbing again...  Goodnight...

04 April 2010

Solar Hot Water Collector

Evacuated tube, that is...  There are two basic kinds of solar hot water heaters out there (besides your typical garden hose in the sun), a flat panel collector, where you have a circuit of copper tubing running inside an insulated flat chamber, and evacuated tube.  The whole tube is not in a vacuum, but actually the outer shell of the tube is a double walled tube, and between those walls is an evacuated tube.  In the middle, there is a fin mechanismn that picks up the heat (trapped by the vacuum and the fact the glass is thermally opaque, so it can't effeciently radiate its heat back through the glass).  The fins transfer the heat to the copper tube in the middle, which contains a little bit of a working medium, which boils and evaporates, becomes superheated, and then transfers the heat to the top of the tube, where the copper tube is exposed to the insulated manifold header, where the water runs across, picks up the heat, and takes it back to the storage tank. 

No, I didn't invent this thing... I just bought it, and I think it's really cool.


There is, of course, a raging debate over which type of panel is better, but bottom line, the flat panel is normally cheaper, and the tubes are more...not for me, though, because I don't buy anything the normal way.  In our climate, we could have easily used either, but we chose the tubes for these reasons...

1.  Cool factor (yup, vanity)
2.  Higher operating output
3.  Much higher temperature output (not more heat, but more "temperature voltage")
4.  Higher resistance to hail
5.  Modular... Broken tube, change it out.
6.  Easier installation (perhaps)
7 Higher resistance to freeze
8.  Availability

I could go on...

Anyway, 30 tubes in all, have the potential to produce about 38,000 BTU/Day, or the same as 11.3 kWh per day, which at our utility rate of about 12 cents/kWh that translates to about 41 dollars per month...average.  Payback in my opinion is instant, especially if we ever had to sell the house.  There are other advantages, with tricky accounting, and I would never go into those here ;-)  Suffice it to say I have a 1.2 million pound heat storage device ;-)

OK, so here is a little experiment, moring haze, with no load on the panel, so the pipe can't get rid of it's heat, hooked up a thermistor to my non contact temp gun.  The big number, 67F, is the temperature of the grass, and the little temperature is the heat pipe, 200F and climbing fast.




Then off to check out the progress on the tile.  Most of which is now laid in the "fields", mainly they have to do the ridges and then tidy up around plumbing and flashed walls, neither of which is going to happen anytime soon, as I need to line those guys up...



You can click on these, which make them big, for much better color...  It rained in the night a little bit, which washed away a lot of the tile dust, so the color was even better than before without all the "dusty rose" powder color on things.



Starting the Master Bath tile, which was about the last thing to go.





Then, off to my regular warehouse hardware store for something to build a frame to hold the solar collector.  Of course, with a normal house, and a normal person, you could have just mounted the thing on a 5/12 pitch and about averaged out the use between summer and winter at this latitude, and on a shingle roof you wouldn't have to do much for flashing other than a little silicone...  But, we are on a tile roof, so the collector doesn't sit on the tile, it sits on the deck below, and has to be suspended up above the tile.  So here is my solution...  1/2 inch pipe fittings.  I have also decided I want to optimize the panel only for the winter season... Why??  Because the rest of the year I am trying to maximize the use of the desuperheater (which makes the GSHP run more effeciently).  To make a short story long, the solar panel with run us a chance of overheating things in the summer, because between the desuperheater, the solar collector, and low demand for hot water, we could easily cook the water past the boiling point (at atmospheric pressure, anyway, which of course we have in excess of 50 PSI which significantly raises the boiling point)...  regardless, by optimizing the panel at a higher angle in winter, there is less angle of incidence in summer, and the panel can't produce as much heat as it otherwise would in the summer....hopefully causing us to not have a boiling event which causes the pressure relief valve to let go.  In addition, it gives me more effeciency (though with less sun) in the winter, when I need the heat more.  Additionally, in the middle seasons, I am also closer to optimum when there is less chance of the desuperheater being in operaiton... Bored YET???



This is a closer look at the header, which is an extruded aluminum piece that holds the copper manifold and accepts the evacuated tubes, as shown...  They just sit in there, nothing magic.


Nifty little plastic widgets at the bottom pop onto the rail, and then allow you to tighten and push up on the tubes, holding them in position on the collector.



Another view down the row of 30 holes... 

Any why the upside down and backwards h shape?   Because I wanted the frame to have some resistance to the shear effect of having the collector being fairly heavy, and the pipe brackets being fairly small.  This makes the thing much harder to "twist" and makes it a lot stronger.  I honestly don't think you will see any of this from the ground, which is all under the collector tubes, but, I painted them anyway... brown.



So, my strategy for installation...  Tomorrow I am hoping to get the vertical supports actually mounted to the roof deck (the only place not tiled in) and then they can actualy drill holes in the appropriate place for the tile to slide over the pipes.  Then, I will have them tile the field under the collector completely, but leave a perimeter at the sides and bottom.  The copper lines coming through the roof have to wait for a special piece of flashing I ordered (later in the week), but after than happens, I can pierce the roof with the copper and then solder on all the fittings, as well as run the wire to the thermistor (temperature sensor for the controller).  I can then mount the collector frame and header.  If you mount the tubes dry, repeated heat cycles aren't good for their health...





02 April 2010

Roof Tile

Last few days have been a flurry of activity again.  Took a few days off from construction to actually do my job...  Nothing really got done on the house, but I did need to collect my thoughts and do some shopping (per my last post).

So, here it is.... At last, the long awaited Monterosso Blend....  We basically picked this tile a few years ago at a roadsize display between Austin and San Antonio.  We both like all tile, but this particular blend was chosen independently and almost instantly as we backed up and down the feeder that day...


Anyway, the colors are all over the place.  It depends on how the light is shining, shadows, sky color, background color, etc.  If you are looking up at the house, you see the edges of the tile and they look different yet.  Also the color varies if you can see the ridges, or the ridges and the valleys together.   We counted 7 colors originally off the pallets, but there are easily 5 different shades of each of those, as the color glaze is hand applied and then fired at the factory.  Each tile is different.... oranges, reds, browns, whites, blacks, plums, grey, etc. 


This was the view up the driveway Tuesday morning.  I think there were over 30 pallets of these things.  Heavy... uh, yes.  Note the blue sky and leaves coming in on the trees!






This they called a "crawler".  It was very heavy itself and chewed up the ground pretty good.  Things are still very wet here and if you get off the driveway, you will sink in pretty good.  They were able to get around the back of the house pretty well with this thing, but I informed them the front yard was off limits!  So they basically walked the tile up and over from the back to the front where needed.

OH, this thing had foam filled tires.  I can't imagine how many roofing nails this thing has crewed over...




Looking East over freshly stacked tile.  This is actually not a random event.  Each stack is carefully placed in with a specific quantity.  They drive nails so they don't slide off the roof. 


Now over the North and East.




This pic didn't come out very good, the camera made the sky white and washed everything out.  But the tile continues, and they have some down at this point.




Here again, looking up from the bottom you can see the tile edges so you see more of a terra cotta color. 




Another washed out picture of the front.




Look how closely they cut the tile down through the valley...  I am happy because you can't see the shiney valley flashing anymore.  The black straps were all over the place...  In fact, two entire pickup loads of trash just from the pallet wrappers and straps, not including the pallets themselves...




From the driveway. 




Looking west now



And the same part of the roof from about 5 pictures ago, but different angle, different light, looks nothing the same.



Glad to see the leaves back, and a peek at the house from the street.


Different light again from the driveway, and they had finished up a lot more tile at this point.


And the garage.  Check out the ruts the "crawler" made while trucking around in there.  This area has been wet from day 1.  I would love to figure out a way to make it drain, but if I do that I trap water off to the left, which is worse...  Crawler didn't seem to mind, and it stirred up the muck a little bit and smells a little like the first day of construction, when the dozers were chewing around in this stuff...



So, here is the process for the tile...

1.  Stress the structure to hold it.
2.  Put a permenant self sealing membrane under the tile
3.  Load the roof with tile.
4.  Start at the eve, with a birdstop (I should have taken a picture of this)
5.   Tile the field from bottom to ridge.
6.  Cut the ridges and valleys to meet as appropriate.
7.  Install the tile ridge caps (these are single barrel tiles...caps without the pans)
8.  Mortar everything in place at the caps.
9.  Give all your money to the roof contractor.

I should note too that we are out of order on a few things.   Normally, the plumber has made his vent penetrations and the HVAC guys have put in any vents.  Well, the plumber isn't here yet.  So the tile guys will come back and help with those penetrations later.  I am hoping for a bare minimum of vent penetrations... How, you ask...  (yes, I heard you ask that)...  Instead of using the traditional plumbing vent method of sticking a pipe out the roof, we are going to try to maximize the use of vent valves.  Which is an air entrance valve that allows air to enter into the plumbing vent system without allowing any to escape.  So, they can be used inside the structure and draw air down when needed, but don't allow gas to flow in the other direction.  We will still need a few vents though, so the plumbing can achieve a neutral pressure to the exterior.  But, every roof penetration is a potential for a problem, and they look like crap.


So, what was I doing while all this work took place????  The wood burning chimney.  The wood buring fireplace in the Living Room vents up into the chimney chase.  In a nutshell, the vent tubes come in pieces and have to be installed up through that space.  In my case, they were 4 feet long and about 15 inches in diameter.  There is an inner and outer lining, the inner being stainless steel, and the outer galvanized metal.  These pieces are supposed to click right together...  yea, right, with a bulldozer on top of them maybe...  I also had to cut a large piece of plywood to accomodate the transition from "sealed" attic to "non-sealed" chase.  There were all kinds of braces and such in there and this board ended up looking like a strange piece of jigsaw puzzle, and it had to fit into the chase at the 5/12 pitch of the roof.  Anyway, after several hours, I was able to get all this into place. 

The chimney looks pretty small from the ground, but it is actually about 8 feet tall when you stand beside it, and the openings are about 24 inches square.  In this picture I had just stuck the chimney cap inside to make sure it fits in there...  This entire assembly has to be covered in non-flammable material.  In my case, they will use real stucco inside and out of this whole thing, with a metal pan flashing where the flu pipe goes through the top of the chase.  The rest of the structure on top is made of cement board, so it is not flammable.  I think I will paint the chimney cap black...  With your permission...



Ok, that's it for now.  Sorry for the absense, and hope you check back often.

  Happy Easter!!

26 March 2010

Buying Spree

Wow,

The last 24 hours I've been acting like a teenage girl in a mall with a stolen credit card...

Deal with the plumber was that I would provide the supplies.  I think that just means the pex, but I went ahead and bought other things I am pretty particular about, like the ice box stubouts and laundry boxes. 

Tangent alread...

What is driving this spending spree is that I now have the plumber, electrician, roofer, hvac, and foam insulator all descending on me at the same time.  Top that with soon they will be starting stucco and stone on the outside and things will be pretty crazy.

So, sounds stupid, but I made a decision to go ahead and include a solar hot water heater NOW, rather than waiting.  I'm thinking it's just so much easier now to place the unit and have them flash around the mounts and then dodge them with the tile. 

Today I had 144 items in my "cart" with the online plumbing store, and even forgot a bunch of stuff, so will probably make another order. 

Here are the highlights...

1.  Solar Evacuated Tube 30 tube collector and manifold
2.  Propex water distribution manifolds. (about 80 ports worth)
3.  80 gallon dual heat exchanger stainless steel hot water tank
4.  40 gallon single heat exchanger stainless steel hot water tank
5.  4000 feet of Wirsbo Propex
6.  300 feet of 3/4 inch Wirstbo Barrier Pex (Oxygen barrier tubing)
7.  2 expansion and purge kits for 2 of the 3 closed loop systems (direct hot water and radiant heat)
8.  4 supply and return manifolds for radiant heat.
9.  Exhaust fans for all the bathrooms (really really really really quiet ones)
10.  A lot of little other things that you will NEVER see in a normal house.  Mostly pertaining to the ability to charge, purge, control, the flow of energy through the various water systems.

The tanks were a cool find.  I had thought I would go with a different tank and use only a 2 tank system, but at the last minute, I found the stainless tanks and they were cheaper.... To boot, I can solve my issue with the GSHP having another layer of safety between a potential refridgerant leak and the potable water system.  This of course adds another layer of complexity, and an additional mix pump.  But in the end, this arrangement is more of a known quantity...

So, as I am ordering all the plumbing supplies, I basically played out everything in my mind from one end of the house to the other and ordered parts as it came up, which was changing constantly based on availability, as well as the tank changes.  Again, this took almost a 24 hour nonstop period on the computer, all at one website.  I was afraid my computer would crash or I would lose the shopping cart to some disaster. 

I ordered a lot from this company, but the tanks from another, the manifolds from yet another, and even used ebay and saved a couple hundred dollars at one point. 

Here is what I DIDN'T buy, so donations accepted...

1.  Solar pumping station and controller (leaning towards the new Taco Solar station, though)
2.  Flashing to get the copper tubing through the roof to the collector.
3.  UV resistant wrap for the foam.
4.  Temperature probe for the solar collector (has to be in place before they flash)
5.  Lighting control system (just didn't get to it today)
6.  Control and distribution pumps for the radiant heating system (Taco RMB mixing block system)

That last item I need 2 of, in case you are buying.

Oh, and a 50 gallon electric water heater, which won't be hooked up, but rather hooked up as a "dummy" tank that will serve as the desuperheater storage tank (waste heat off the A/C system dumped into this tank will then flow to the others so we don't have to add as much energy down the line)

That's it...

I know, you hate me.... No pictures.   Don't have time and I didn't want you to think I was dead.

Have a great night...

I have to buy a torch...  I have a TON of copper to put together.

18 March 2010

Slow Progress

Thought I would make a blog entry, but don't have much to add.

Last week the framers pretty much finished what they had to do (except cleanup ;-( )

Anyway, being the ultra picky hyper complicator that I am, I decided it was better to finish the flashing on the windows myself rather than have them do it.  So, without knowing how the framers would have done the flashing, I can't say anything but to say I am WAY more picky about this particular operation than you can imagine.

I am also a little disappointed in the windows in ONE regard...  The ones that have arches on them do not have a traditional integrated nailing flange.  Rather, they have a fold out plastic flange, and on the top, it is a curved thing that isn't just one piece, but sometimes 2 or 3...  So, after I finished (so I thought) flashing and caulking the first arched window, I walked inside and looked out.... I could see light right through where the flange attaches to the window.  It wasn't sealed at all!  So, I am using polyurethane caulk to completely seal the flashing and nail flange all together in one piece.  It is tedious beyond my patience level, and yet has to be done.  Normally, done at the top of a ladder, which makes it less fun.

Here is a picture of a fully flashed window...  What you can't see is 1 1/2 tubes of caulk to get everything as watertight as I could make it...




This is a rectangular window, so it has the integrated nailing fin around the perimeter as part of the frame.  These are much easier to flash.  Which is good, because I have 27 more of them to do...  It takes about 30 minutes to do a rectangular one, so you do the math...  The arch ones take more like 90 minutes each.


Now, I like the framers, but I'm not thinking they were going to spend this much time playing around with rubber tape...

Oh, also had to flash two arch NON recessed windows in the garage.  Those windows have house wrap and traditional framing.  I used a piece of flex flashing over the top of those, and that worked quite well.  Also had to flash the garage where the fake window and shutter will be.  Since that is tapered down, there is a sill there that otherwise would collect water.  I pulled the wrap back from that area, and basically did a repeat of the window job with some modifications. 

Does anybody know what to do where the housewrap meets the garage doors???  I am thinking it purdent to address moisture there too...  Water rots wood, and rain can easily blow over on the stucco there and saturate everything...



Today, I had some guys come over to haul a load of trash (boards) off.  They were nice guys and filled up a 16 foot trailer pretty well.  They dented the pile pretty good, but I could easily do 3 more loads.  They will come for another load tomorrow, and then we will see if I can resume those duties.

Also put in some large joist hangers where we added some beams to carry the roof load over some ceiling areas.  Reading the Simson Strong Tie book, they called for 16 penny nails (into a glue beam).  I'm not the best with my hammer, and that beam was hard as iron.  I bent over every third nail and beat the crap out of my fingers in the process.  Also added some more hurricane (wind) ties in areas where I thought were appropriate.  They tied the rafters to the garage wall, but the garage wall wasn't tied to the concrete (or sill plate).  I was out there hammering away till almost 9:30 PM, playing classical music.  I wonder if my new neighbors have figured out I am weird yet??  I'm not done, of course, but I was feeling guilty about making all that noise.

We live about 200 miles from the Gulf of Mexico, and we get the remnants of hurricanes at times.  For the life of me, I can't figure out who would NOT put on a 51 cent hurricane tie.  Even with a tile roof, at over 100,000 pounds, that roof makes enough lift at about 70 knots of wind to fly right off.  Wouldn't that be embarrasing, to spend all this money on an ICF house and then have the roof blow right off...


More random stuff to do tomorrow.  I want to run the fireplace chimney up through the chase, and see how it fits.  I will be in Houston tomorrow late and if I need a different size chimney piece I can pick it up while I am down there. 

More pictures soon.




12 March 2010

Window Awning

How cool is this thing?  If it were up to me, I would have probably forgot this was even on the plan, my brain is all over the place, one minute picking up crooked nails and sawdust, and the next minute fielding lumber orders and writing multi thousand dollar checks...

Anyway, the framers were rightly proud of their craft on this one.  They started by cutting out the outler layer of ICF foam, and then using concrete anchor bolts to attach a 2x6 ledger board, and then started adding layers of cedar.  I crack up watching them, because they make things look really easy using tools that are pretty crude in comparison to what is available.  My buddy and me have had lots of emails and phone calls discussing how to best cut the corbels...  Obviously, we need to buy a great big bandsaw, get some beer, pipe music or football into the garage, carefully measure...  etc. 

Not the framers....  skillsaw, recip saw, and a belt sander.  And they look very nice.  The guys even cut the wide sweep radius on the support brace.  The decking for this awning is more 2x6 T&G select prime.  And since they were worried the tile guys would shoot nails through it, they added a layer of plywood to the top of decking (makes it thick enough the nails can't penetrate the bottom), and then ripped concrete board to match exactly the drip edge dimensions so nothing can rot. 




Here is another shot that shows underneath a little better.  Tile goes on top... 

Mama likes it!


Yes, I still have a lot of flashing to do.  As much as I like the framers, their flashing skills are fragile.  They had definitely refined their technique on flashing the window before installation, though.  Today, when they set the big dining room window, which was 7 feet wide by 8 tall, they really impressed me with the flash job.  Of course, they even whipped out their measure sticks for everything and marked it all off. 

Tomorrow I need to get all the windows that are NOT covered flashed on the exterior.  I can wait on the ones covered under the porch areas...

The framers are done,  I think...  There are a few minor things that may need looked at, but I will wait until the inspector has a go before I make my list. 

Hauled off 2 loads of trash today, which was mostly window wrappings...cardboard, plastic, flashing backing, and roof debris.  Didn't even dent the board pile.  So, I think I will resort to a service for some help on the board pile.  My time is worth far more than they charge, and my little bitty truck just doesn't carry much.  Getting the paper type trash out was a priority, though, in case it rains.

OK, I am rambling...  Sorry. 

Have a great weekend.



Windows, Exterior Doors, Peek at the Tile

Another 2 MAJOR progress days.

Seems like right now if you blink you miss something major.  Today the windows were scheduled for delivery.  For most people building a house, this is probably a fun moment where you get to see what your windows will actually look like.  For me, it meant trying to figure out how to properly flash the window opening both before and after the window was installed.  More on that below, but here is the result of a half installed 2x2 archtop Jeldwen Window, on a 3 inch ICF recess.  (put all that in there for the Google seach)



Mainly what you see right now is flashing, stickers, and pastic protection strips.  The windows have a protective film over them to keep the glass from getting scratched.  The actual frame sits about an inch behind the face of the ICF, and with the stucco coming out another inch, I think they will look great both inside and out (I just now realize I don't have a picture of the inside to show)



So, just on the unlikely premise that anyone actually reads this blog to get ideas on how to flash a window... Here is mine...  It's not perfect, but it's what I call due diligence.  I used a combination of mfm straight 9 inch window wrap in conjunction with their 9 inch FLEX.  Here are the steps...

1.  1 foot Flex wrap bottom left and right, install with dogear facing down only in recess
2.  Straight flashing across bottom of recess
3.  1 foot flex bottom left and right inside corner, overlaps steps 1 and 2
4.  Straight flash across bottom of window opening, overlaps steps 1-3.
5.  Straight flash up sides entire cavity from midpoint of buck depth following the contour out.
6.  Install window with high quality polyurethane sealant liberally at sides and top only.

At this point, the picture doesn't show the following steps.

7.  Side flashing with straight flash nailing fin left and right
8.  Corner flash top left and right with 1 foot each flex.
9.  Finally, straight flash the top from nailing fin upwards.  If you are flashing an arch top, then use Flex

Note:  This house doesn't have house wrap on most of it because it is ICF, but if you have house wrap, then you have to integrate that too.  From what I researched, you cut an upside down martini glass, then fold in the sides and bottom and staple to the inside.  Then basically do what I did here.  The top of the house wrap gets pulled up out of the way until the window is installed and flashed, and then it folds down over the flashing and is skip taped.  Always work from the bottom up.  Even if you don't have a recessed window the flex wrap is good because it allows you to bend an outside corner without any holes.  The basic rule is that water should shed down and always out.  Never trap the water, and shed it to the outside of the housewrap.

It takes a LOT of time to do this.  Took me all day to do about 14 windows, and I was working as fast as I could.  I showed the framers what I wanted done... got a couple of flat stares, but by the end of the day they were on board after they had done a few. 

Ok, that horse is dead.



From the back.  My entire house now looks like a Jeldwen advertisement.  These windows are a fixed window over an awning casement.  Keeps the view from standing height good, yet still allows you to open the bottom.  Kids rooms up front had to have egress requirements, so we had to use double hung windows there and in the guest. 



Exterior doors also came.  This is the only Alder exterior door that we have, and I am quite frankly a little nervous about it swelling and contracting in our profuse climate.  My buddy tells me this gets better after they have the door stained and sealed.

The other doors are fiberglass due to their exposure.  They will be stained (except the garage door).  This door is bigger than it looks, it is 36 inches wide and 8 feet tall, it is on the back of the house from the powder bath hallway out to the rear porches, and it COMPLETELY protected from rain and sun...otherwise, I would have used a fiberglass door.



The roof guys worked all day again.  They already had the vast majority of underlayment down, but today they worked away at all the flashings.  This shows a little preview of the Claymex tile (not our colors, but the same shape and size).  They are also laying out red lines where the tile will go.  Much more prep work than I anticipated.  I had not had much chance to chat with these guys, too busy down below, but they are extremely nice and were very proud of their work.  The rubber underlayment is much harder than I thought it would be.  Doesn't feel soft at all when you walk on it.  By the way, I am a complete chicken up there.  My roof pitch is only a 5/12, which is pretty flat for around here... Anything more and I wouldn't go up there.  Another pet peeve of mine...  Too high pitched roofs...  They look good for some architecture, and I'll give them a pass if you do a nice tile or shake, but with asphalt shingles they look goofy...  You can drive through my existing neighborhood and all you see is roof.



Looking East.  Nothing but trees in all directions.  This picture shows more of the work the roofers have done.  They had to lay out the ridge board, which is where the tile gets "capped" at the top.  This board is flashed with what looks like tar paper, but it is something a little more advanced than that. 

To contrast the window flashing, same is true up here.  Flash for the water starting low and working up.  The difference here is that in a hard rain, there are hundreds of rivers up here with serious water coming down.  Nothing for an amateur like me to attempt.  The valley flashings here are attached, and then mesh and mastic forces any water on the underlayment onto the flashing for a very fast ride down.


Our tile is going to be a blend... Claymex Monterosso Blend, to be exact, which is a vast blend of earth tone colors, everything from almost white to plum, reds, and browns.  I am a fan of clay tile over concrete for both performance reasons and even more so for looks.  Check out the little channels in this tile that allow the water to escape down and out without getting trapped in the tile.  Very cool.



Underneath, the tile is ribbed for strength...and maybe for pleasure (hey, they have to come from somewhere).  Clay tile is much stronger than concrete, as it is a fired product.  Also holds it's color much better over time.  It also has some insulation value to it, although pretty minor.  OH, it also doesn't need batten boards to hold in in postion.  Concrete tile has an "ear" than hangs over these battens to hold it up.  Our tile will sit right on the roofdeck, for better or worse.

Don't get me wrong, though, I'm not a clay tile snob, I'm a tile roof snob.  A concrete roof tile is still an awesome roof.  Talking to these guys today, it sounds like the key to the whole thing is keeping people off of your roof...  Uh, satellite guy, don't even think about going up there. 



Ok, it's been 48 hours since my body has seen a real bed, so I am going there now...

Till later.

08 March 2010

Exposed Cedar Beams...

A couple of days ago the special order cedar and 2x6 pine tounge and groove material came in for the front porch.  Today they got to the big moment to put all this up.  I had been led to believe that this was all going to be a cake walk and they had it all figured out...   Well, in the end, we all stood there with tape measures and pencils and tried to figure this thing out... Turns out, that the beams were fine, but the spacing didn't quite work out over the front stone area, and thus would look uneven from the outside.  Now, I tried to convince them that sometimes things like this add visual interest...when your eye catches these things it causes you to look harder, and you end up seeing more details.  No go... 

So, after about 30 minutes, the decision was made that they would put a regular framed roof over this area, but hide the entire assembly with the cedar and pine...  What you see here is the result, or at least the beginning.  5 evenly spaced 4x6 cedar under the bigger 4x12 cedar ridge beam.  The outside of this area will get soffits and then the cedar will appear to extend out from the wall under the soffits, but in fact they will just be decorative. 

There are several advantages to this approach... They will use less cedar, less 2x6, and we stand no chance of nails penetrating from the roof down through the cedar.  There will also be a place to hide wires for lights.  Also, the roofer added concern that he needed a "rake" on the front to attach the tiles to so they wouldn't try to "roll" off the front.  So, in the end, I think everyone is happy. 

And, it's georgous!!


From this next picture you can see they have now put osb all the way up the gable.  The soffits will be on in the morning, I'm sure.

The shape of this looks much better now and not so goofy, but remember this whole assembly will be covered in real stone, so it will look a lot more substantial.  (and the window will appear to shrink, which it should)

Top view... Yes, I climbed up on the roof.  It's actually quite pleasant to walk around up there, only a 5/12 pitch makes you feel pretty safe.  But, even though it's just a single story, it would be best to have nobody fall off...


Looking about 45 degrees left from the last picture, sighting over the higher portions of the roofline.  There are a lot of ridges and valleys.  I like it this way, breaks things up.  The weather today was just on the verge of misting all day.  Not cold, but certainly not dry.  Tonight we missed a HUGE band of thunderstorms which cut just north on the radar...  Last thing we need here is more rain.


Here, the cupola over the Master Bath is started.  Looks cute so far...


Ah, but at the end of the day, I don't like it as much.  Starting to look like they are going to oversize the soffit on this cupola too much.  I will meet them early AM tomorrow and have them shrink the overhang down a bit on this. 

It kills me to interfere in what they are doing, but these little things can bug you to death, and it's very easy to correct it now.


Tomorrow is a big day... 

First, have to have the cupola meeting, which means out there early...  Then, have to assemble the pocket door frames (5 of them), then haul a load of trash to the dump, then off to storage to get the window wrap and some more tools, then back to sample wrap a window for the guys to follow. 

The window wrap, or flashing, is more complicated than normal, because I am trying to tend to the recessed ledge at all 4 corners, and keep that area from leaking in addition to the window opening itself.  So, we are using a fairly expensive product that allows you to "flex" it around the corners.  Probably overkill, but I am trying to be prudent.

OH, then work all night tomorrow night, after I pick up some fireplace parts on my way into the city... 

Windows are coming Thursday about the time I get back.  Exterior doors too perhaps.  I will want to fall into a pile at some point that day...

Have a great day...